Pristatymo terminas kiekvienai prekei nurodomas prie kainos bloko.
Pristatymas visoje Lietuvoje: nemokamas.
Trumpai apie prekę
Prekė: Kryžminis lazerinis nivelyras 16 linijų, 4D, su 2 akumuliatoriais ir 100 cm trikoju. Kategorija: Lazeriniai lygiai.
- Gamintojas: ONEVAN
- Modelis: Poziomica Laserowa
- Ilgis: 23 cm
- Svoris: 2.75 kg
1. Degree of protection: IP54
2. Measurement accuracy: ±1 mm/7 m
3. Automatic levelling range: ±3°
4. Working range: 25 m
5. Remote control range: 25 m
6. Remote control of the application: yes
7. Laser type: Class 2 laser: 515 nm
8. Laser line model: 16 lines/4D
9. Operating temperature: -10-50°C
10. Battery: 3,7 V-4,2 V
11. Battery Capacity: 4x1200
12. Remote control range: 30 m
Features:
- Digital LED display, downloadable app, precise measurement and more convenient operation, easy operation.
- Automatic ±3° leveling function and ±1 mm/7 m measurement accuracy, precise measurement and more convenient operation.
- High brightness green light, clear both inside and outside. Long projection distance, high laser height, clear lines, visible in sunlight.
- High-capacity battery with longer lifespan.
- The slope at any angle can be achieved by tilting the body.
The set includes:
1 x Laser Level
1 x Metal Base
1 x Lifting Base
1 x Top Wall Mount
1 x Laser Adapter
1 x Remote Control
2 x battery
1 x Charger
1 x Oxford Bag
1 x Tripod 1 m
- Construction and renovation of the house
- Laying tiles and panels
- Installation of suspended ceilings
- Installation of windows and doors
- Electrical and hydraulic installations
- Home DIY Work
Specifications
| Group | Name | Value |
|---|---|---|
| Parametry | Condition | new |
| Parametry | Invoice | With VAT invoice |
| Parametry | Brand | ONEVAN |
| Parametry | Model | Poziomica Laserowa |
| Parametry | Power supply | rechargeable battery |
| Parametry | Maximum working range | 25 m |
| Parametry | Measurement accuracy (+/-) | 1 mm |
| Parametry | Number of laser beams | 16 |
| Parametry | Laser color | green |
| Parametry | Horizontal line display angle | 360° |
| Parametry | Vertical line display angle | 360° |
| Parametry | Protection rating | IP54 |
| Parametry | Product height | 14 cm |
| Parametry | Product width | 20 cm |
| Parametry | Length | 23 cm |
| Parametry | Weight | 2.75 kg |
| Parametry | Manufacturer code | sku006551_2 |
| Parametry | EAN (GTIN) | 758745685272 |
| Parametry | Product weight with unit packaging | 3.6 kg |
| Parametry | Batteries included | yes |
| Parametry | Packaging status | original |
| Parametry | Additional features | 360° laser,works below zero degrees Celsius,cover included,self-leveling,handle included |






