Piegādes termiņš katrai precei ir norādīts pie cenas bloka.
Piegāde visā Latvijā: bez maksas.
Trumpai apie prekę
Prekė: Voninė svarstyklė Withings Body Scan, balta. Kategorija: Vonios svarstyklės.
- Gamintojas: Withings
- Modelis: Body Scan
Bathroom scale Withings Withings Body Scan white
ID: 13215462
Specifications
| Group | Name | Value |
|---|---|---|
| Parametry | Condition | new |
| Parametry | Invoice | With VAT invoice |
| Parametry | Brand | Withings |
| Parametry | Kind | electronic |
| Parametry | Model | Body Scan |
| Parametry | Platform material | glass |
| Parametry | Dominant color | white |
| Parametry | Maximum load | 200 kg |
| Parametry | Measurement accuracy | 50 g |
| Parametry | Product depth | 32.5 cm |
| Parametry | Product width | 32.5 cm |
| Parametry | Product weight | 0.15 kg |
| Parametry | Manufacturer code | WBS08-White-All-Inter |
| Parametry | EAN (GTIN) | 3700546707964 |
| Parametry | Certificates of conformity | CE |
| Parametry | Units of measurement | pound (lb),kilogram (kg) |
| Parametry | Additional features | non-slip base,automatic calibration,auto power-on,automatic shutdown,Bluetooth,muscle mass,smartphone connection,measuring muscle mass,fat level measurement,water level measurement,user recognition,bone tissue,fat tissue,Wi-Fi,low battery indicator,measurement memory,body water content |



