Penalas Absolute Hooklength Long Leaders


Cena:
Akcijas cena€35,95
Noliktava:
Ir noliktavā

Trumpai apie prekę

Prekė: Penalas Absolute Hooklength Long Leaders. Kategorija: Dėžės ir konteineriai.

  • Gamintojas: Preston
  • Modelis: Absolute Hooklength Boxes
  • Spalva: silver

Preston Pencil Case for Absolute Hooklength Long Leaders

different

Absolute Hooklength Box - Long

Long box for rigs

Designed to accommodate rigs ranging in length from 4” (10 cm) to 12” (30 cm), this box offers plenty of storage space while maintaining a compact profile.

The Absolute leader boxes are constructed with a durable, reinforced shell that is closed with magnets to ensure water resistance.

A huge range of internal pegs allows you to use this box to store rigs for all kinds of methods, from pole to feeder.

• Slim profile

• Durable construction

• 10 pins to fit all hook designs

• Waterproof seal

Dimensions: 33x9x2,5 cm

Review photos

  • Condition: New
  • Brand: Preston
  • EAN (GTIN): 5056317726183
  • Manufacturer code: P0220123
  • Model: Absolute Hooklength Box - Long

Marketing Authorisation Holder (Manufacturer): BV Preston Innovations Europe Dennenlaan 3A City: 2340 Beerse Belgium compliance-europe@ratheroutdoors.com GPSR compliant data

Specifications

Group Name Value
Parametry Condition new
Parametry Invoice With VAT invoice
Parametry Brand Preston
Parametry Manufacturer code P0220123
Parametry Model Absolute Hooklength Boxes
Parametry Product weight with unit packaging 0.1 kg
Parametry Kind box
Parametry Color silver

Piegādes termiņš katrai precei ir norādīts pie cenas bloka.
Piegāde visā Latvijā: bez maksas.

Saistītās preces

Nesen skatītās